Shower Renovation – A Step by Step Guide
Showers are one of the littlest rooms in the house and they are also one the most expensive to renovate. A shower renovation is a vocation that, if done well, can increase the value of a home and a great space brimming with design and light.
Shower design
Shower design is the principal territory of your shower redesign you have to get right. Simply supplanting the current shower with a similar design may not be sufficient. The way to great shower design is to design it with the general population that will utilize it as a main priority.
Shower rebuilds
If you have chosen to take the necessary steps yourself or part of the work the time has come to enlist a skip canister and haul out the old shower. You will require some full body dispensable overalls, eye security, and quality residue veil.
Shower Renovation and development
Showers must be development appropriately starting from the earliest stage to ensure that the completed activity is right and genuine. This also ensures the design and look of the shower will have a great completion
The Shower Renovation Process
1. Install water and seepage pipe and electrical wires.
2. Install wall coating and roof and after that install the shower hob and shower.
3. Waterproof the floor and shower and shower break.
4. Correct the fall of the floor with sand and bond prepared for tiling.
5. Lay floor and wall tiles and after that grout.
6. Install new shower vanity, fittings, and taps – install new electrical.
7. Paint roof and last clean.
Stage one – Plumbing and electrical
Now all new pipes are installed for clean hot and cold water and seepage. Watchful consideration should be taken when situating the new pipes so that the pipes fittings are right when the tiling is done. For instance: To focus a fitting in shower renovations you should mull over the thickness of the wallboard, tile paste and tile so the fitting will be focused after the tiles are set up. The equivalent applies to installing seepage funnels for a can; the wall covering and tile thickness must be considered so the pipe is in the right position when the latrine is installed in the wake of tiling. Also unpleasant in any new electrical wires without associating them to the mains control.
Stage two – Install wall and roof linings
Install your 6mm wall lining being mindful so as to nail the fibro board each 150mm without nailing into the new pipes and electrical wires. The best path is to measure and check the pipe and wire layout onto your new wallboard with a pencil as you go. Mess up (or nail) the roof lining, plasterboard is the most well-known.
Stage three – Waterproof your shower
Waterproof your shower floor, shower break, and around the shower. The shower break will be waterproofed 100mm over the shower rose outlet. Also the shower remodelling Sydney ought to be waterproofed 100mm over the lip of the shower ideal around and to the floor.
Stage four – Lay in the concrete screed for the floor.
Before the floor tiles can be laid the floor must be smooth and genuinely level with a slight tumble to the waste outlet. To do this you should utilize sand and bond blend and it is best to include a waterproofing specialist into this also. With a dimension, set the floor level at the entryway.
Stage five: Tile floor and walls
Lay your tiles on the floor first and afterwards grout. At that point lay your wall tiles ensuring that they are level as you lay. When the shower tiles have happened cut & laid, grout every one of your tiles and after that buff those tiles clean.
Stage six: Install plumbing-fitting & fixtures
Install all your pipes fittings and taps. Fit your new shower vanity ensuring it is level and fixed around the best with silicone and furthermore seal around the shower. Tip: ensure they are in the opportune place before you bore into your tiles.
Stage seven: painting, and cleaning – appreciate
Paint your roof and complete a last clean ensuring everything is fitted accurately and that there are no leaks in your pipes.
Enjoy your new shower!